Home
last modified time | relevance | path

Searched refs:startdate (Results 1 – 7 of 7) sorted by relevance

/openssl/apps/
H A Dca.c100 int multirdn, int email_dn, const char *startdate,
112 int multirdn, int email_dn, const char *startdate,
121 int multirdn, int email_dn, const char *startdate,
291 char *prog, *startdate = NULL, *enddate = NULL; in ca_main() local
368 startdate = opt_arg(); in ca_main()
881 if (startdate == NULL) in ca_main()
882 startdate = in ca_main()
955 startdate, enddate, days, batch, extensions, in ca_main()
1341 int multirdn, int email_dn, const char *startdate, in certify() argument
1670 if (!set_cert_times(ret, startdate, enddate, days, 0)) in do_body()
[all …]
H A Dx509.c298 int text = 0, serial = 0, subject = 0, issuer = 0, startdate = 0, ext = 0; in x509_main() local
528 startdate = ++num; in x509_main()
580 startdate = ++num; in x509_main()
1032 } else if (i == startdate) { in x509_main()
/openssl/apps/include/
H A Dapps.h86 int set_cert_times(X509 *x, const char *startdate, const char *enddate,
/openssl/doc/man1/
H A Dopenssl-ca.pod.in32 [B<-startdate> I<date>]
232 =item B<-startdate> I<date>, B<-not_before> I<date>
256 When used together with the option B<-not_after>/B<-startdate>, the explicit
522 The same as the B<-startdate> option. The start date to certify
833 certificate validity period (specified by any of B<-startdate>,
H A Dopenssl-x509.pod.in33 [B<-startdate>]
260 =item B<-startdate>
/openssl/apps/lib/
H A Dapps.c3277 int set_cert_times(X509 *x, const char *startdate, const char *enddate, in set_cert_times() argument
3280 if (!check_cert_time_string(startdate, "start date")) in set_cert_times()
3284 if (startdate == NULL || strcmp(startdate, "today") == 0) { in set_cert_times()
3290 if (!ASN1_TIME_set_string_X509(X509_getm_notBefore(x), startdate)) { in set_cert_times()
/openssl/
H A DCHANGES.md154 `-startdate` and `-enddate` options.
18974 * Fix -startdate and -enddate (which was missing) arguments to 'ca'

Completed in 95 milliseconds